Analysis of Supply Chains and Quantitative Evaluation of Mechanical Connecting Couplings (Ancon, PRESKO, RECO, HALFEN) for Large-Scale Nuclear Energy Projects
Construction of nuclear power plants (NPPs) of Generation III+ (such as the Russian VVER-1200, European EPR, and Korean APR-1400) imposes exceptional requirements on the integrity of reinforced concrete structures, especially the reactor containment. The containment is the last safety barrier and must maintain its structural integrity under the most extreme design-basis accidents and external impacts, including strong earthquakes, impact loads (for example, the fall of a large object or an aircraft impact) and internal pressure arising from the melting of the active zone.1
In these critically important zones, the use of mechanical couplers for reinforcing bars has become not just a matter of convenience, but a strictly regulated technical requirement. The traditional lap splice (lap joint) of reinforcing bars has significant drawbacks: it creates a high concentration of reinforcement, which complicates concrete placing and vibration, and also depends on the quality and bond of the concrete to transfer the load.3
Latest News
Nuclearelectrica's proposal to review SMR options rejected by ministry
In a statement after the proposal was voted against by shareholders, including the majority sharehol...
Korean-US partnership for floating SMR platform
Under the MoU, Samsung Heavy Industries and Sargent & Lundy (S&L) plan to develop a standard...
Multiple MSRs proposed for French industrial park
A major player in technology, artificial intelligence and digital infrastructure, Unitel Group co-fo...
The construction of new reactors at Kozloduy remains a strategic bilateral priority.
The new board of directors of Kozloduy NPP-New Build has held official talks with the chargé d'affai...
Comments
No comments yet. Be the first!
Leave a comment