Analysis of Supply Chains and Quantitative Evaluation of Mechanical Connecting Couplings (Ancon, PRESKO, RECO, HALFEN) for Large-Scale Nuclear Energy Projects
Construction of nuclear power plants (NPPs) of Generation III+ (such as the Russian VVER-1200, European EPR, and Korean APR-1400) imposes exceptional requirements on the integrity of reinforced concrete structures, especially the reactor containment. The containment is the last safety barrier and must maintain its structural integrity under the most extreme design-basis accidents and external impacts, including strong earthquakes, impact loads (for example, the fall of a large object or an aircraft impact) and internal pressure arising from the melting of the active zone.1
In these critically important zones, the use of mechanical couplers for reinforcing bars has become not just a matter of convenience, but a strictly regulated technical requirement. The traditional lap splice (lap joint) of reinforcing bars has significant drawbacks: it creates a high concentration of reinforcement, which complicates concrete placing and vibration, and also depends on the quality and bond of the concrete to transfer the load.3
Latest News
The total installed capacity of nuclear power plants in China has exceeded 120 million kW.
(Source: Xinhua Agency) 04/23/2026, 08:46Beijing, April 22 /Xinhua/ -- As of the end of 2025, the to...
BREAKING NEWS: Belgium takes control – negotiations to buy all nuclear power plants from Engie.
The Belgian government and energy giant Engie signed a letter of intent that opens the door for a fu...
Projections up to 2050: global nuclear capacities grow by 2.6 times.
Nuclear energy is entering a new phase of expansion, guided by the need for energy security and ambi...
NuScale announces an increase in SMR power.
NuScale Power has announced a 25% increase in the power output of its small modular reactor, the NuS...
Comments
No comments yet. Be the first!
Leave a comment