Expert Analysis Report on EDF/Egis Preliminary Technical Study (PTS)
This expert report analyzes the Preliminary Technical Study on peaceful use of nuclear energy in Serbia, conducted by French company EDF and Egis Industries under a €120,000 contract. The study is structured in three areas: institutional roadmap with 19 necessary steps according to IAEA, technical analysis of Generation 3+ reactors and small modular reactors (SMR), and assessment of integration into the national power system with participation of operator Elektromreža Srbije. The document contains comparative analysis of technological options, timeline assessment (5-7 years for the first two IAEA phases), and recommendations for prioritizing SMR as the optimal solution for rapid replacement of coal capacity while maintaining Gen 3+ as a reliable alternative for baseload.
Latest News
The total installed capacity of nuclear power plants in China has exceeded 120 million kW.
(Source: Xinhua Agency) 04/23/2026, 08:46Beijing, April 22 /Xinhua/ -- As of the end of 2025, the to...
BREAKING NEWS: Belgium takes control – negotiations to buy all nuclear power plants from Engie.
The Belgian government and energy giant Engie signed a letter of intent that opens the door for a fu...
Projections up to 2050: global nuclear capacities grow by 2.6 times.
Nuclear energy is entering a new phase of expansion, guided by the need for energy security and ambi...
NuScale announces an increase in SMR power.
NuScale Power has announced a 25% increase in the power output of its small modular reactor, the NuS...
Comments
No comments yet. Be the first!
Leave a comment