Joining the Nuclear Power Plant Construction Project
Participation in the project to construct a nuclear power plant (NPP) represents a strategic decision for any large company — whether in construction, engineering, or mechanical engineering. This is not an ordinary commercial contract, but a ticket to the market, characterized by exceptional long-term stability and high technological requirements. The motives driving companies to take this step lie in the realm of macroeconomic, geopolitical, and technological factors.
Latest News
REGULATORY MAPPING OF THE SMALL POWER NPP PROJECT ACP100 (Linglong One) STRUCTURAL GUIDE AND COMPARISON MATRIX OF THE REGULATORY AND LEGAL FRAMEWORK FOR NUCLEAR PROJECTS IN THE PRC
The company NUCON has developed the "Engineering Navigator" for the integration of Chinese nuclear t...
Dome lifted into place on Ningde 5
The lifting and installation process for the 45-metre-diameter dome took a total of two hours and fo...
I recommend watching the video about the miniaturization of reactors in China, which details, from an engineering perspective, the features of the integral layout of the Linglong One (ACP100) iPWR reactor, the principles of its passive safety, and how Chinese engineers shortened the factory assembly time of the core module.
Nuclear-powered ship conceptual designs approved
Approval in principle is a symbolic procedure in which a classification society reviews the design o...
Comments
No comments yet. Be the first!
Leave a comment