Strategic assessment of site selection and infrastructural imperatives for the development of nuclear energy in Serbia.
The Republic of Serbia, after the official lifting of the 35-year moratorium on the construction of a nuclear power plant in late 2024 1, has entered Phase 2 of the IAEA Milestones Approach (Milestones Approach). This phase, which, according to estimates by the Ministry of Mining and Energy (MME), will last 5–7 years 2, is focused on site selection (Site Selection), creation of the regulatory framework, and preparation for the tender.
Latest News
REGULATORY MAPPING OF THE SMALL POWER NPP PROJECT ACP100 (Linglong One) STRUCTURAL GUIDE AND COMPARISON MATRIX OF THE REGULATORY AND LEGAL FRAMEWORK FOR NUCLEAR PROJECTS IN THE PRC
The company NUCON has developed the "Engineering Navigator" for the integration of Chinese nuclear t...
Dome lifted into place on Ningde 5
The lifting and installation process for the 45-metre-diameter dome took a total of two hours and fo...
I recommend watching the video about the miniaturization of reactors in China, which details, from an engineering perspective, the features of the integral layout of the Linglong One (ACP100) iPWR reactor, the principles of its passive safety, and how Chinese engineers shortened the factory assembly time of the core module.
Nuclear-powered ship conceptual designs approved
Approval in principle is a symbolic procedure in which a classification society reviews the design o...
Comments
No comments yet. Be the first!
Leave a comment