Analysis of stakeholders in the nuclear energy development program in accordance with IAEA documents. Roles and responsibilities.
Designing and implementing a national nuclear energy program (NPP) is a complex and long-term task that requires coordinated efforts from a wide range of governmental, regulatory, and private entities. The International Atomic Energy Agency (IAEA) has developed a methodology called "Phases" (Phased Approach), outlined in the publication IAEA Nuclear Energy Series No. NG-G-3.1 (Rev. 1), Phases in the Development of National Infrastructure for Nuclear Energy.1 This methodology provides a structured framework to ensure that member states develop the necessary national infrastructure in phases.
Traditionally, three main organizational entities are involved in the development of a nuclear energy program, whose specific roles and levels of responsibility dynamically change as the project progresses 6:
1. Government (State).
2. Owner/Operator (Owner/Operator).
3. Regulatory Body (Regulatory Body).
Latest News
Nuclear Energy is Feasible in Serbia: Presentation of the Preliminary Technical Study on the Peaceful Use of Nuclear Energy
The results and conclusions of the preliminary study on the peaceful use of nuclear energy in Serbia...
The latest study: a massive economic footprint of the AP1000 reactor fleet in the United States.
A new study by PricewaterhouseCoopers (PwC) estimated that building a fleet of ten Westinghouse AP10...
Construction of Bushehr nuclear power units 'remains a priority'
Russia's state nuclear corporation Rosatom is in the process of building two VVER-1000 units at the...
EDF has established a global advisory board for investments. Is Serbia one of the 'beneficiaries'?
At the Paris summit held yesterday and the day before yesterday, EDF launched FINABe (Financing and...
Comments
No comments yet. Be the first!
Leave a comment